Charging Pile Machines
充电桩整机The finished charger: cabinet, power modules, gun and meter. Public piles grow slowly while home chargers boom, and pile makers earn thin margins.
- China charging pointsJun 2026
- 23.06 millionup 43.2% year on year
- Public vs private charging pointsJun 2026
- Public over 5 millionup 22.3%; private 18.05 million, up 50.4%
- XJ Electric charging equipment and other manufacturing servicesH1 2026
- ¥749.2mup 29.75%, margin 15.43%
China's position
China had 23.06 million charging points by June 2026, but growth is now in private home chargers, not the public DC piles these makers sell. The two listed pile makers earned thin margins in H1 2026 while module prices fell.
Overview
What a charging pile is and how it works
A charging pile is the finished charger: a cabinet holding power modules, a control board, a meter, a payment terminal and a charging gun, connected to the grid on one side and the car on the other. The module decides the power; the pile decides how that power reaches the car safely, how it is metered and billed, and how it talks to the operator's network.
Piles split into two kinds. AC piles are slow chargers, usually 7 kW, installed at homes and workplaces; they hand AC to the car's onboard charger, which does the conversion. DC piles are fast chargers, from 60 kW to 480 kW and above; they convert power inside the pile and feed DC straight to the battery. DC piles are the product the listed makers in this node sell, and they are built by stacking modules: a 120 kW pile is typically three 40 kW modules or two 60 kW modules in parallel.
The newest DC piles add liquid cooling, which lets a gun carry 600 A and more without overheating, and the megawatt systems for heavy trucks now entering the market. XJ Electric sells liquid-cooled supercharging piles alongside its AC and DC range (2026 interim report, p. 13).
Why it matters for the chain
The pile is the unit operators buy, so pile demand tracks station construction. China had 23.06 million charging points by the end of June 2026, up 43.2% on a year earlier, but the growth has moved: public facilities grew 22.3% to over 5 million, while private facilities surged 50.4% to 18.05 million (National Energy Administration, via Xinhua). County-level coverage reached 98.61%, so the build-out phase is largely done.
That split matters for pile makers. The fast-growing half of the market is private AC wallboxes, a low-value product most listed makers barely touch. The public DC pile market they serve is growing at half the speed of the total, and the next demand driver is not more piles but faster ones: megawatt charging for heavy trucks, where about 3,000 heavy-truck charging and swap stations are planned by 2030 (Sinexcel 2026 interim report, p. 18).
Where China stands
Pile making has three kinds of supplier, and the two listed in this node show the contrast:
- XJ Electric (许继电气, 000400.SZ) is the grid equipment giant: charging equipment and other manufacturing services brought in ¥749.2m in the first half of 2026, up 29.75%, at a 15.43% margin, inside ¥6.53bn of total revenue. Its parent is China Electrical Equipment Group, and its customers are grid companies and operators buying in bulk (XJ Electric, pp. 7, 19, 64).
- Inkerui (英可瑞, 300713.SZ) is the power-electronics specialist: its new-energy vehicle charging power line fell 34.01% to ¥68.0m at a 10.75% margin, and the company lost ¥41.1m in the half. Its profitable line is power operation supplies for substations, at 34.83% (Inkerui, pp. 7, 15).
Operators also build their own piles. TGood sells charging equipment alongside running the largest public network, and Sinexcel sells ¥747.7m of charging equipment, up 18.25%, at a 30.43% margin, from its power-electronics base. The pile business is not a standalone industry; it is a product line inside grid equipment, power electronics and charging operations.
The economics: thin margins, slow public growth
Pile margins are thin wherever they sit. XJ's charging segment earns 15.43%, below its own company average of 19.90% and well below its substation systems at 26.11% (XJ Electric, p. 19). Inkerui's charging line earns 10.75%, down 5.75 points in a year, and the company says module homogenisation and falling prices left its Shanghai base under-used (Inkerui, pp. 15, 20). Sinexcel is the exception at 30.43%, and even there the margin fell 4.43 points (Sinexcel, p. 28).
The squeeze has the same cause as in modules: too much capacity chasing public piles that grow 22% while the private market grows 50%. Inkerui puts it plainly in its own report: the charging market is shifting from building piles to operating them, and the industry is consolidating (Inkerui, p. 24).
Our view: the pile is becoming a commodity cabinet around a module, and the money in charging keeps moving downstream to whoever runs the station and sells the electricity. The pile makers that survive will be the ones with another business paying the bills, XJ's grid equipment or Sinexcel's data-centre power, or the ones that win the liquid-cooled supercharging upgrade cycle.
What to watch
- Liquid cooling and megawatt piles. Whether the upgrade to faster piles restores pricing power, or the price war follows the technology up the power ladder (XJ Electric, p. 13; Sinexcel, p. 18).
- The public-private split. Private chargers grew 50.4% in the half against 22.3% for public ones; pile makers tied to public stations need the heavy-truck and highway supercharging cycle to replace lost volume (National Energy Administration, via Xinhua).
- Consolidation. Inkerui says the industry is in a shake-out; watch for exits and mergers among the smaller unlisted pile makers, and for whether its own charging line stabilises (Inkerui, p. 24).
- Operators building their own. TGood and Sinexcel both make piles and run networks; if operators keep more pile orders in-house, independent pile makers lose their best customers.
Key companies
- XJ Electric许继电气000400.SZState-owned power equipment giant from Xuchang. Charging equipment is a small but fast-growing line inside a ¥6.5bn first half, with thin margins.
- Inkerui英可瑞300713.SZShenzhen power-electronics specialist selling DC charging modules and systems. NEV charging revenue fell 34% in H1 2026 and the company stayed loss-making.
Key metrics
| Metric | Period | Value |
|---|---|---|
| China charging pointsNational Energy Administration, via Xinhua | Jun 2026 | 23.06 millionup 43.2% year on year |
| Public vs private charging pointsNational Energy Administration, via Xinhua | Jun 2026 | Public over 5 millionup 22.3%; private 18.05 million, up 50.4% |
| XJ Electric charging equipment and other manufacturing servicesXJ Electric 2026 interim report, p. 19 | H1 2026 | ¥749.2mup 29.75%, margin 15.43% |
| Inkerui NEV charging power revenue and marginInkerui 2026 interim report (corrected), p. 15 | H1 2026 | ¥68.0mdown 34.01%, margin 10.75% |