TGood Electric
特锐德Charging network operator and substation maker; it says it runs about 960,000 public charging terminals, but H1 2026 charging revenue was flat at ¥1.83bn.
- Public charging terminals (company claim)Jun 2026
- about 960,000
- Charging network operations and services marginH1 2026
- 40.18%up 8.45 points
- Electric vehicle charging revenueH1 2026
- ¥1.83bndown 0.83%
Overview
Business
TGood (青岛特锐德电气股份有限公司, Qingdao TGOOD Electric) has two businesses: power equipment, led by prefabricated substations, and electric vehicle charging. It says it is China's largest EV charging equipment maker and charging network operator, and the world's largest maker of high-voltage prefabricated substations, which are its own claims (2026 interim report, pp. 9, 20).
Results
In the first half of 2026 revenue rose 6.07% to ¥6.64bn and net profit attributable to shareholders rose 30.7% to ¥427.5m (p. 7). By business (p. 31):
- Power equipment: ¥4.81bn, up 8.95%, at a 24.17% gross margin.
- Electric vehicle charging: ¥1.83bn, down 0.83%, at 33.65%, up 3.40 points. Within it, charging equipment earned ¥1.10bn, down 2.5%, at 29.37%, and charging network operations and services ¥721.8m, up 1.84%, at 40.18%, up 8.45 points.
Overseas revenue fell 37.8% to ¥373.7m (p. 31).
The network
The company says its network covers more than 90% of Chinese provinces and prefecture-level cities and had about 960,000 public charging terminals at the end of June 2026, the most in the industry, which is its claim. It offers liquid-cooled charging up to 1 MW for cars and buses and a 4 MW dual-port system for heavy trucks, and has linked 40 grid dispatch and virtual power plant centres, managing more than 12,000 dispatchable charging stations (pp. 19, 20).
Where it stands
TGood earns more from running charging stations (40% margin) than from selling charging equipment (29%), and its charging revenue was flat in the half. See charging and battery swapping.
Key metrics
| Metric | Period | Value |
|---|---|---|
| Public charging terminals (company claim)2026 interim report, p. 19 | Jun 2026 | about 960,000 |
| Charging network operations and services margin2026 interim report, p. 31 | H1 2026 | 40.18%up 8.45 points |
| Electric vehicle charging revenue2026 interim report, p. 31 | H1 2026 | ¥1.83bndown 0.83% |
| Net profit attributable to shareholders2026 interim report, p. 7 | H1 2026 | ¥427.5mup 30.7% |